• Client: CEMIG
  • Location: Sao Simão/GO
  • Description: supply of the São Simão substation modernization system belonging to CEMIG. The substation modernization consisted of:

 

  • Installation of protection, teleprotection and measurement panels;
  • Electromechanical installation of Patio equipment at 138KV (CTs / PTs / Lightning rods / Circuit breaker / Disconnector);
  • Installation of telecommunication equipment (Radios / Antennas);
  • Installation of auxiliary power system (battery banks);
  • Physical tests of electrical equipment;
  • Parameterization and testing of IED's;
  • Commissioning and Start-up.